Stopped Well We Have No Income Drought

Stopped Well, we have no income, drought, which can buy bricks? Or the first drought, and the money later make. " "Family members accepted it? Your husband do?" "He had no objection, he would occasionally find time to come back to help me pull the water." Yan said tube. Walking in the township most difficult way to go This route
Has now been revised, and a week before the more rotten! And the former compared to what I ran on it as if from the pavement on the highway! " Half an hour later, 18 large buckets, all full. Subsequently, the tube Yan again a big drum full of car, "This can hold 200 kg of water, is used to

your ads here

If They Are Selling Water

"If they are selling water, I made another!" Tube Yan smiled cheerfully. In the rural roads, according to the distance and road conditions distance calculation, somewhere closer to price 40 yuan  cubic meter, far and in places with poor road conditions, such as pipe to the Cha Yan village group, the price of water up to 170 yuan  180 yuan 
Cubic meter, if a vehicle can sell water to sell 89 100. But the tube Yan to Cha village in bottled water is a duty, not money, or even dig their own water fees are per vehicle 10. Since this car is used to pull water, no way to brick the brick delivery, had temporarily suspended. "Brick stop loss how
To do it? The government to subsidize it?" A reporter asked. "Without subsidies, the oil money, fill the tire and repair shops have their own money out." Tube Yan simple and honest smile. Stood business do not do, is not it stupid? Tube Yan laughed: "drought Well, we all hit the water than the wisdom for all important. Brickyard stopped

Paid Attention To The Seven One

Paid attention to the seven one gathering area. In accordance with the "Environmental Impact Assessment Law," the relevant provisions of the coal chemical industry base must be planning to do the EIA. Last year in August, Jingjing qualified mine has commissioned the preparation of the EIA coal chemical base units in the EIA report, at present, the preparation of this
Report has been basically completed, but has failed to provincial and municipal environmental protection department for approval, especially given the water source relevant provisions of the constraints. In February 2007 the state’s new "drinking water source protection zone delineation technical specifications" issued after the implementation of Shijiazhuang City, Environmental Protection Agency in accordance with the technical specification of the Gang

The Situation. Although The Official Let

The situation. Although the official letter on the report referred to "quasiprotected areas", "Enterprise technology does not meet the national industrial policy", and others more reasonable explanation, but this enterprise, "since construction began in May 2008 has failed EIA, "" do not meet the State Development and Reform Commission in December 2008 19 Nisshin’s coking industry access policy "," initial
Project construction is located within the three drinking water source protection area "three issues are the confirmation. Then went to Chang Heng’s Energy Technology Development Co., Ltd. Hebei Province, the production plant, see the company main production facilities have been the first phase of construction completed and has the capacity, full of coking coal yard. Jingxing mining area is mainly
Responsible for the Government to explain "EIA" and "water source" issue, said, according to the Hebei provincial government "to promote economic structural adjustment on a number of opinions" spirit of the document, "Jingjing mining of coal chemical industry base in the economic cycle of planning," included in the coal chemical industry development planning in Hebei Province, Shijiazhuang municipal government has

Project’s Cost Is High. explore New Begi

Project’s cost is high. "explore new beginning, the high cost of some is normal, but the technology road is still a large area from the road to go. "Nie said he personally thought that, so do the garbage processing cement plant, whether from economic or practical effect, may not necessarily be the best choice." Project has just been put into
Operation, the actual effect of particular environmental impact will take some time to know when we will invite qualified domestic units have to do dioxin testing. Come back when you can be in June! "Lee said peaks. According to Pan Yue, vice minister of environmental protection instructions, press recently reported on the masses of Energy Technology Development Co., Ltd. Hebei
Province, Chang Heng illegal construction projects and other issues to investigate. After investigation, the letter reported by the masses proven to be true. Reporter went to Hebei Province, Jingjing area, and the district government, district environmental protection bureau responsible person and responsible discussion of Shijiazhuang City, Environmental Protection Agency, heard Jingxing main person in charge of mining the government of

Waste Treatment Capacity Of 300 Tons

Waste treatment capacity of 300 tons of garbage just is Tongling daily output. With the second set of equipment in the Conch Cement production line to complete the construction, daily processing capacity will reach 600 tons, to meet the Tongling city of the future growth of solid waste needs. Tsinghua University, Solid Waste Pollution Control and Resources Institute, said Nie
Yongfeng, cement kiln for the decomposition of dioxin really good results. The combination of cement kilns and waste, after all one can try the new route. However, one problem is that, if excessive waste, excessive chlorine will destroy the alkaline cement kiln production environment, production of cement. However, the amount of daily processing of 300 tons not that great, you
Can run to see the final result. "In addition, he also pointed out that building a separate waste incineration project cost is 3040 yuan per ton, therefore, 120 million yuan is equivalent to a high standard incineration plant costs, and the company’s waste disposal systems are also conch saved the followup of tail gas treatment plant. In other words, the

Leakage And Other Environmental Issues.

Leakage and other environmental issues. Therefore, the Tongling city government began looking for a new waste disposal path. "Just Conch Cement Company offered the combination of cement production and waste disposal. Thus, the two sides hit it off." Said Liu Jun, the waste disposal company Advanced Payment construction project by the conch, at present, the total investment of 120 million
Yuan, which in addition to debt 10 million yuan, the local government has not spent a penny. "This is corporate social responsibility." In the face of reporters, "Why do companies have to spend so much money, nothing to do with the profits" of the doubt, Lee told reporters peaks. However, according to report, the performance of the company as conch,
The company expanded production scale, the local government to give them some preferential policies. "According to our search, until, at home and abroad are not the same technology, which will live in Chinese cities a positive impact on waste disposal." Conch Cement Company Limited, said deputy general manager of Chengji made it. It is understood that this waste disposal equipment,

Through The Cement Kiln

Through the cement kiln, one of two out of dioxin decomposition chlorine was absorbed by cement alkaline material, thus eliminating the dioxin regenerate. "explained Lee peaks. He also stressed: "alone to build a waste incinerator, there should be followup device on dioxin for processing, the cost is very expensive. It often leads to two consequences  either incineration plant is running
At a loss, or that dioxin emissions below standards. but with the combination of cement kiln incineration, then just make up the major shortcomings of the greatly reduced cost. "In addition, the high temperature air in through the cement kiln, you can also replace part of cement kiln fuel, save energy effect. "We found through the calculations, if the waste
Heat is higher than 1200 calories, one year, the cement kiln to save 10,000 tons of standard coal can." Peaks Lee added. Why waste incineration Tongling will go this route? Liu Chun explained that before the municipal solid waste to landfill Tonglingbased, but one of the original landfill can not meet the needs of urban development, and frequent spontaneous combustion,

Heat Value Of The Adaptation Range

Heat value of the adaptation range is wide, as long as the heat value of 850 kcal higher than the burning of garbage can. "Tongling city Sanitation Authority Management Office, said Liu Jun , Tongling city garbage in the annual average heat value of about 1240 kcal, slightly lower in summer. In response, Lee said peaks in the low calorific
Value waste, they will go to mixed coal gasifier, mixed with coal is far lower than the proportion of "not more than 20" of state regulations. However, after the initial burning of waste will be gasified to contain toxic substances, dioxin in the hot gas, how to solve this problem? "Let’s dioxin decomposition first condition is that temperature at 800
Degrees Celsius, the second is to stay more than two seconds. And cement kiln temperatures above 900 degrees Celsius, air in which the residence time of about 4 seconds, just to satisfy these two conditions. In addition, the more important point is that, due to the production of cement is alkaline environment, dioxin is acidic, and when the heat flow

Wall I Saw A Garbage

Wall, I saw a garbage truck was approaching slowly backward, feeding mouth, rolling gates automatically open, garbage trucks will be unloaded into a huge garbage garbage pit. At this point, slowly extended from the roof top of the two machines under the "giant hand." "This is a grab, its function is to grasp the refuse pit uniform, easy to burn.
Recently, every day, 100 vehicles, about 220 tonnes of rubbish here." Lee, general manager of Tongling Conch peaks introduced the. "As China has yet to achieve their refuse, and not through the classification of low caloric value of waste, generating high costs. Our biggest advantage of this system is a waste not classified." Peaks, said Lee, the reason to do
This is because the choice of A new incinerator furnace  gasifier. "There are highWen Shiying gasifier sand, garbage into the furnace, heat quickly quartz sand, drying and burning of combustible waste to be completely gasified. Not flammable, such as beer bottles, brick tile, etc., just to be used raw materials for cement production. gasifier is the main advantage of waste